There has been so much going on at my house for the past week; especially yesterday (being the Ekka Show holiday). We got the solar span patio roof installed with plumbing and electricity put into it. The plumbing went in the house (but no hot water as we have to move it and it got turned off so we can do that). At least I can wash my hands now and get water to drink. The weekend we painted with the undercoat of most of the main living area. I have to do all the cutting in and then we do the defects then paint a second undercoat, then the colour (That's how it is done on multimillion dollar houses; no quick sprays here)
Solar span roofing panels (they click together and snap on facsure (the coloured bit) goes on the outside. |
The roof panels |
The crane ready to lift the panels. |
The vanity sink installed and working |
The new square look toilet (we have 2 more to go into the other rooms at a later date) |
Under the patio roof
looking into our master bedroom |
Isn't the canter leaver design great?
The wiring for fans and lighting |
The air will flow over the roof and under the patio cooling it in summer |
The shower all working (but still needs to be siliconed around the edges to be totally waterproofed. |
my sink is all hooked up now (minus the hot water) |
The dishwasher is now in too |
Oh my goodness it's all so shiny and new. Love the bathroom sink very nice :)
ReplyDelete